Standard Installation
![](https://nomada.tech/wp-content/uploads/2019/07/STANDARD.jpg)
Raised Floor Installation
![nomada virtual reality platform](https://nomada.tech/wp-content/uploads/2019/07/INSTALACIÓN-SUELO-TECNICO-Model-1024x466.jpg)
Installation by our specialized team, with total guarantee of operation, in less than 1 hour.
We can install our omni platform below a raised flooring to get a more accessible installation. We propose a dry construction systems so the installation can be easily built and removed.